コミット履歴

作者 SHA1 メッセージ 日付
  Roger Dingledine 72c5a46b43 move the todo.external file into svn projects 15 年 前
  Roger Dingledine b1e61353ec note that proposal 160 is written. note that section 4.5 is done. 15 年 前
  Sebastian Hahn d230827912 Remove all svn metadata minus what I missed. 15 年 前
  Roger Dingledine b949871a1e move some of the items out of the 'phase one' section 15 年 前
  Roger Dingledine 43a2ef61dd put in the performance todo items that i marked as high-priority in 15 年 前
  Roger Dingledine 97dfa611d1 note some progress we've made on a few of them 15 年 前
  Roger Dingledine 8b63944ed2 put the 'phase 2' preliminary todo items in place 15 年 前
  Roger Dingledine 6f057325d0 cut out a lot of the external todo items, since they're done 15 年 前
  Roger Dingledine 4a52728953 it turns out that removing external deliverables from the list just 16 年 前
  Roger Dingledine 5f545912e5 mark a few todo items as deferable 16 年 前
  Roger Dingledine 1ca25b36d7 remove some done or abandoned items from the external todo 16 年 前
  Roger Dingledine d478948844 admit that the "get a relay operator mailing list going" plan is the 16 年 前
  Roger Dingledine 5a52c7a70c remove some done items, clarify a few others 16 年 前
  Roger Dingledine 44a3587d74 mark off some done items 16 年 前
  Roger Dingledine 5519e633ec New controller event "clients_seen" to report a geoip-based summary 16 年 前
  Roger Dingledine a32477db65 propset on our new todo lists. why can't svn just know what i mean. 16 年 前
  Roger Dingledine 1d91776071 add another torbutton issue that needs solving 16 年 前
  Roger Dingledine cb4d773063 add more deliverables: somebody needs to pick up weasel's nlnet work. 16 年 前
  Roger Dingledine 92167e25a0 tabman returneth 16 年 前
  Andrew Lewman 9e8f8223db summarize the Vidalia Marble integration, and pick a date for 16 年 前
  Roger Dingledine 3f75a57d34 mark the high-priority items that really ought to get done before 16 年 前
  Roger Dingledine 9dd0516003 add four items that ibb wants to see. 16 年 前
  Nick Mathewson df9257c6ff Note that thandy-client json2xml works, and afaik Matt is satisfied with it. 16 年 前
  Roger Dingledine c15b07bb30 more updates on our todo files 16 年 前
  Roger Dingledine 84581b4723 first cut of mid-february goals. 16 年 前
  Roger Dingledine f475d99eb4 and even better still 16 年 前
  Roger Dingledine e6ae970dd6 update our external constraints to match reality better 16 年 前
  Karsten Loesing 814135b9a6 Mark mid-August item done; also, mid October comes before end of October. 16 年 前
  Roger Dingledine 4cb2adcd4f update the external constraints. still need to add in the BBG items. 16 年 前
  Roger Dingledine 42ca0d4270 break the todo file into three todo files. 16 年 前