Roger Dingledine
|
72c5a46b43
move the todo.external file into svn projects
|
%!s(int64=15) %!d(string=hai) anos |
Roger Dingledine
|
b1e61353ec
note that proposal 160 is written. note that section 4.5 is done.
|
%!s(int64=15) %!d(string=hai) anos |
Sebastian Hahn
|
d230827912
Remove all svn metadata minus what I missed.
|
%!s(int64=15) %!d(string=hai) anos |
Roger Dingledine
|
b949871a1e
move some of the items out of the 'phase one' section
|
%!s(int64=15) %!d(string=hai) anos |
Roger Dingledine
|
43a2ef61dd
put in the performance todo items that i marked as high-priority in
|
%!s(int64=15) %!d(string=hai) anos |
Roger Dingledine
|
97dfa611d1
note some progress we've made on a few of them
|
%!s(int64=15) %!d(string=hai) anos |
Roger Dingledine
|
8b63944ed2
put the 'phase 2' preliminary todo items in place
|
%!s(int64=15) %!d(string=hai) anos |
Roger Dingledine
|
6f057325d0
cut out a lot of the external todo items, since they're done
|
%!s(int64=15) %!d(string=hai) anos |
Roger Dingledine
|
4a52728953
it turns out that removing external deliverables from the list just
|
%!s(int64=15) %!d(string=hai) anos |
Roger Dingledine
|
5f545912e5
mark a few todo items as deferable
|
%!s(int64=15) %!d(string=hai) anos |
Roger Dingledine
|
1ca25b36d7
remove some done or abandoned items from the external todo
|
%!s(int64=15) %!d(string=hai) anos |
Roger Dingledine
|
d478948844
admit that the "get a relay operator mailing list going" plan is the
|
%!s(int64=15) %!d(string=hai) anos |
Roger Dingledine
|
5a52c7a70c
remove some done items, clarify a few others
|
%!s(int64=16) %!d(string=hai) anos |
Roger Dingledine
|
44a3587d74
mark off some done items
|
%!s(int64=16) %!d(string=hai) anos |
Roger Dingledine
|
5519e633ec
New controller event "clients_seen" to report a geoip-based summary
|
%!s(int64=16) %!d(string=hai) anos |
Roger Dingledine
|
a32477db65
propset on our new todo lists. why can't svn just know what i mean.
|
%!s(int64=16) %!d(string=hai) anos |
Roger Dingledine
|
1d91776071
add another torbutton issue that needs solving
|
%!s(int64=16) %!d(string=hai) anos |
Roger Dingledine
|
cb4d773063
add more deliverables: somebody needs to pick up weasel's nlnet work.
|
%!s(int64=16) %!d(string=hai) anos |
Roger Dingledine
|
92167e25a0
tabman returneth
|
%!s(int64=16) %!d(string=hai) anos |
Andrew Lewman
|
9e8f8223db
summarize the Vidalia Marble integration, and pick a date for
|
%!s(int64=16) %!d(string=hai) anos |
Roger Dingledine
|
3f75a57d34
mark the high-priority items that really ought to get done before
|
%!s(int64=16) %!d(string=hai) anos |
Roger Dingledine
|
9dd0516003
add four items that ibb wants to see.
|
%!s(int64=16) %!d(string=hai) anos |
Nick Mathewson
|
df9257c6ff
Note that thandy-client json2xml works, and afaik Matt is satisfied with it.
|
%!s(int64=16) %!d(string=hai) anos |
Roger Dingledine
|
c15b07bb30
more updates on our todo files
|
%!s(int64=16) %!d(string=hai) anos |
Roger Dingledine
|
84581b4723
first cut of mid-february goals.
|
%!s(int64=16) %!d(string=hai) anos |
Roger Dingledine
|
f475d99eb4
and even better still
|
%!s(int64=16) %!d(string=hai) anos |
Roger Dingledine
|
e6ae970dd6
update our external constraints to match reality better
|
%!s(int64=16) %!d(string=hai) anos |
Karsten Loesing
|
814135b9a6
Mark mid-August item done; also, mid October comes before end of October.
|
%!s(int64=16) %!d(string=hai) anos |
Roger Dingledine
|
4cb2adcd4f
update the external constraints. still need to add in the BBG items.
|
%!s(int64=16) %!d(string=hai) anos |
Roger Dingledine
|
42ca0d4270
break the todo file into three todo files.
|
%!s(int64=16) %!d(string=hai) anos |