Commit History

作者 SHA1 備註 提交日期
  Roger Dingledine 72c5a46b43 move the todo.external file into svn projects 15 年之前
  Roger Dingledine b1e61353ec note that proposal 160 is written. note that section 4.5 is done. 15 年之前
  Sebastian Hahn d230827912 Remove all svn metadata minus what I missed. 15 年之前
  Roger Dingledine b949871a1e move some of the items out of the 'phase one' section 15 年之前
  Roger Dingledine 43a2ef61dd put in the performance todo items that i marked as high-priority in 15 年之前
  Roger Dingledine 97dfa611d1 note some progress we've made on a few of them 15 年之前
  Roger Dingledine 8b63944ed2 put the 'phase 2' preliminary todo items in place 15 年之前
  Roger Dingledine 6f057325d0 cut out a lot of the external todo items, since they're done 16 年之前
  Roger Dingledine 4a52728953 it turns out that removing external deliverables from the list just 16 年之前
  Roger Dingledine 5f545912e5 mark a few todo items as deferable 16 年之前
  Roger Dingledine 1ca25b36d7 remove some done or abandoned items from the external todo 16 年之前
  Roger Dingledine d478948844 admit that the "get a relay operator mailing list going" plan is the 16 年之前
  Roger Dingledine 5a52c7a70c remove some done items, clarify a few others 16 年之前
  Roger Dingledine 44a3587d74 mark off some done items 16 年之前
  Roger Dingledine 5519e633ec New controller event "clients_seen" to report a geoip-based summary 16 年之前
  Roger Dingledine a32477db65 propset on our new todo lists. why can't svn just know what i mean. 16 年之前
  Roger Dingledine 1d91776071 add another torbutton issue that needs solving 16 年之前
  Roger Dingledine cb4d773063 add more deliverables: somebody needs to pick up weasel's nlnet work. 16 年之前
  Roger Dingledine 92167e25a0 tabman returneth 16 年之前
  Andrew Lewman 9e8f8223db summarize the Vidalia Marble integration, and pick a date for 16 年之前
  Roger Dingledine 3f75a57d34 mark the high-priority items that really ought to get done before 16 年之前
  Roger Dingledine 9dd0516003 add four items that ibb wants to see. 16 年之前
  Nick Mathewson df9257c6ff Note that thandy-client json2xml works, and afaik Matt is satisfied with it. 16 年之前
  Roger Dingledine c15b07bb30 more updates on our todo files 16 年之前
  Roger Dingledine 84581b4723 first cut of mid-february goals. 16 年之前
  Roger Dingledine f475d99eb4 and even better still 16 年之前
  Roger Dingledine e6ae970dd6 update our external constraints to match reality better 16 年之前
  Karsten Loesing 814135b9a6 Mark mid-August item done; also, mid October comes before end of October. 16 年之前
  Roger Dingledine 4cb2adcd4f update the external constraints. still need to add in the BBG items. 16 年之前
  Roger Dingledine 42ca0d4270 break the todo file into three todo files. 16 年之前